Available now
01
Outcome Bet Template
Define what success looks like before development begins. State the hypothesis, the measurement plan, and the stakes.
6 sections12 fields
02
Confirmation Record
Close the loop between a bet and its result. A structured verdict documented at the scheduled confirmation event.
8 sections18 fields
03
90-Day ODLC Transition Playbook
A staged 90-day guide for moving from output-oriented to outcome-oriented delivery. Three phases, one structural gate, and a measurable baseline.
3 phases90 days
04
Three CI/CD Gates
Three CI/CD gates that verify instrumentation, validation, and confirmation linkage before and after deployment. A technical spec for platform engineers.
3 gatesPlatform engineering
05
Pre-Sprint Validation Checklist
Eight pre-sprint checks across five questions. Run this in the bet review meeting before any sprint begins.
5 questions8 criteria